 |
The Big Bear has been washed, damaged rack and bumper have
been removed, front drive line has been repaired, and under side of the
frame checked for damage and repainted. Engine checks have been done. |
 |
The body plastic of the unit has been removed as well as the
rear swing arm. The frame is checked for cracks and repaired as needed.
The rear swing arm bearings are checked and greased. The rear axle
bearings are replaced. |
 |
Front Brakes are checked as are the wheel bearings, tie rod
ends, and A-arms. All bolts are checked for tightness and wire harness is
checked for chafing. |
 |
Front CV boots have been checked and replaced as needed. |
 |
New front fender and bumper have been installed. Engine
valves have been adjusted. Rear swing arm is reinstalled and all the
brakes reassembled. Air filter, battery and gearboxes have been serviced |
 |
Clutches are visually checked. We found a crack in the
primary clutch assembly so it was replaced. Engine oil is replaced and
both oil filter and sump screens are cleaned. |
 |
The Big Bear is ready for another six years of hard work. |